19 unit sprinkler loss, which impacted gypsum board, insulation, carpet/padding, and laminate flooring. The property was stick built and gypcrete was used for sound. We were able demo, clean and dry the gypcrete flooring in the 19 units within 7 days while being able to dry the common area. While the building was being occupied.